Cheap Simple EPS Continuous Pre Expander machine
Main features :
1. The material dispatching cylinder is made from stainless steel and has insulation cotton in the inter layer with reliable property ,stable weight ,high production efficiency and low energy consumption.
2. The feeding system of the machine has primary and secondary feeding devices with the foaming density of 7-40g/L.
3. All the feeding ,foaming,screening,crushing,conveying to ripening hopper are all completed automatically.
Item | Unit | PSPEC120 | |
Expansion Chamber | Diameter | mm | ∅1200 |
Volume | m³ | 2.2 | |
Useable volume | m³ | 1.5 | |
Steam | Inlet | mm | ∅40 |
Consumption | kg/cycle | 150-200 | |
Pressure | Mpa | 0.6-0.8 | |
Compressed air | Inlet | mm | ∅25 |
Pressure | Mpa | 0.6-0.8 | |
Drainage | Condensation | mm | ∅20 |
Connected load | Installing power | Kw | 15 |
Density | First expansion | g/L | 14-30 |
Second expansion | g/L | 8-13 | |
Overall size (LXWXH) | mm | 4900X4700X3200 | |
Weight | kg | 1800 | |
Room height required | mm | 5000 | |
Productivity | 15g/L | kg/h | 250 |
20g/L | kg/h | 300 | |
25g/L | kg/h | 410 | |
30g/L | kg/h | 500 |
FAQ
1. Where is your factory located?
We have 2 production plant, one plant locates in Hangzhou which professionally producing EPS/EPP/ETPU machine. Another factory locates in Jiangsu Provide which producing EPS/EPP/ETPU mould. Both two factories are pretty close to the Shanghai port for easiest transportation.
2. Do you have detailed and professional installation manual?
We will provide very detailed installation manuals and videos, and the service until you are satisfied
3. Are you a trading company or a manufacturer?
We are manufacturer.
4. How long is your delivery time?
Normally delivery time is 30~45 days.
5. How many years have your company made this kind of equipment?
More than 10 years.
6. Can I only buy some spare parts from you?
Yes, we also provide all kinds of spare parts that relatives to our machine.
7. How do you pack the equipment?
We will strengthen and protect the equipment to ensure that they will not be damaged during transportation
8. Can you send your staff to install the equipment for us?
Under normal conditions, it is possible. Now it is an epidemic situation.
We will try our best to assist in case wecannot send technician in time. We will also conduct video connections with guests to teach them to install them in place.
9. Can you can design the equipment according to our size?
Yes, it is acceptable
10. How many production lines in your factory?
We have total 10 production line.