Foam Density | 10-30 G/L |
---|---|
Control System | PLC |
Port | SHANGHAI/NINGBO |
Process Control | High |
Steam Pressure | 0.6-0.8MPa |
Voltage | 380V 50Hz |
---|---|
Power | 25kw |
Foaming Density | 12-30g |
Room Height Required | 5m |
Delivery Time | 6-10days |
Room Height Required | 5m |
---|---|
Voltage | AC380V 50Hz |
Process Monitoring | High |
Port | SHANGHAI/NINGBO |
Expansion Chamber Diameter | 1200 Mm |