EPS Basic Type Polystyrene Foam Automatic Bath EPS Pre Expander
1.The machine adopts Mitsubishi PLC and Taiwan HMI with atuo to filling material,auto electronic weighint,auto controlling chamber temperature ,
pressure and level testing to .
2.It is adopted with automatic screw feeding device and electronic weight device to improve the production efficiency and reduce the labor intensity.
3.The temperature and steam pressure in the barrel is adopted with advanced proportional valve and pilot-operated pressure reducing valve to control the temperature difference at ±5℃to ensure the conformity of the dispatched EPS raw materials for avoiding the caking of EPS raw materials due to bad temperature control.
4.The machine is equipped with high temperature and high efficiency fluid drying bed.Have many functions ,including automatic fluidized drying ,automatic screening and ball material crushing after discharging by the pre-expander ,raw materials conveyed to ripening hopper by fan automatically ,etc.
Item | Unit | PSPEB-N150 | |
Expansion Chamber | Diameter | mm | ∅1500 |
Volume | m³ | 3.2 | |
Steam | Inlet | mm | ∅50 |
Consumption | kg/cycle | 15-18 | |
Pressure | Mpa | 0.6-0.8 | |
Compressed air | Inlet | mm | DN40 |
Consumption | m³/cycle | 0.5-0.6 | |
Pressure | Mpa | 0.6-0.8 | |
Drainage | Blower outlet | mm | ∅100 |
The total emission | mm | ∅150 | |
Connected load | Installing power | Kw | 25 |
Density | g/L | 12-30 | |
Overall size (LXWXH) | mm | 6500X4100X5400 | |
Weight | kg | 5000 | |
Room height required | mm | 6000 | |
Productivity | 12g/L | kg/h | 600 |
15g/L | kg/h | 900 | |
20g/L | kg/h | 1200 | |
30g/L | kg/h | 1500 | |
Secend Expansion | 80-1000m³/h |
FAQ
1. Where is your factory located?
We have 2 production plant, one plant locates in Hangzhou which professionally producing EPS/EPP/ETPU machine. Another factory locates in Jiangsu Provide which producing EPS/EPP/ETPU mould. Both two factories are pretty close to the Shanghai port for easiest transportation.
2. Do you have detailed and professional installation manual?
We will provide very detailed installation manuals and videos, and the service until you are satisfied
3. Are you a trading company or a manufacturer?
We are manufacturer.
4. How long is your delivery time?
Normally delivery time is 30~45 days.
5. How many years have your company made this kind of equipment?
More than 10 years.
6. Can I only buy some spare parts from you?
Yes, we also provide all kinds of spare parts that relatives to our machine.
7. How do you pack the equipment?
We will strengthen and protect the equipment to ensure that they will not be damaged during transportation
8. Can you send your staff to install the equipment for us?
Under normal conditions, it is possible. Now it is an epidemic situation.
We will try our best to assist in case wecannot send technician in time. We will also conduct video connections with guests to teach them to install them in place.
9. Can you can design the equipment according to our size?
Yes, it is acceptable
10. How many production lines in your factory?
We have total 10 production line.