Basic Automatic Foam molding Machine
EPS forming machine basic type, stable performance and low price, very suitable for the production of packaging EPS products
Mechanical Structure:
1. Weld together with high-intensity square tube and avoid deformation of the template by tempering.
2. Increase the anticorrosion performance and useful life of the equipment largely after derusting by sandblast.
3. Spray zinc-rich primer for antirust to increase the antirust performance and useful life of the equipment largely after sand blasting.
Electric Control:
1. Controlled by PLC(Mitsubishi) with full-automatic operation in clamping,feeding,heating,cooling and stripping on HMI(WEINVIEW)
2. All the electrical components are adopted with well-known brands at home and abroad with more excellent equipment stability.
3. Stroke adjustment is controlled by encoder ,which is convenient ,which is convenient to adjust with high precision by setting on HMI.
Item | Unit | PSSM140B | PSSM160B | PSSM170B | PSSM180B | PSSM200B |
Mould Dimension | mm | 1400X1200 | 1600X1400 | 1700X1500 | 1800X1600 | 2000X1800 |
Max Product Dimension | mm | 1250X1050X350 | 1450X1350X350 | 1550X1350X350 | 1650X1450X350 | 1850X1650X350 |
Stroke | mm | 170-1420 | 170-1420 | 170-1420 | 120-1370 | 40-1290 |
Steam Inlet | mm | DN100 | DN100 | DN100 | DN100 | DN100 |
Steam Consumption | t/t | (10-15t)Steam of 1t Material | ||||
Cooling Water inlet | mm | DN80 | DN80 | DN80 | DN80 | DN100 |
Cooling Water Consumption |
kg/cycle | 55-150 | 60-180 | 70-190 | 90-200 | 100-220 |
Compressed Air Inlet | mm | DN40 | DN40 | DN50 | DN50 | DN50 |
Compressed Air Consumption |
m³/cycle | 1.8 | 2 | 2.2 | 2.4 | 2.6 |
Vacuum Pump Capacity |
m³/h | 230 | 230 | 280 | 280 | 280 |
Drainage Port | mm | DN150 | DN150 | DN150 | DN150 | DN150 |
Connected Load | kw | 13 | 17 | 17 | 17 | 20 |
Outside Dimension | mm | 4600X2300X3800 | 4600X2500X4000 | 4600X2600X4100 | 4600X2700X4200 | 4600X2900X4400 |
Weight | kg | 5000 | 6000 | 6500 | 7000 | 7500 |
Cycle Time | s | 60-120 | 70-160 | 80-170 | 80-180 | 90-180 |
FAQ
1. Where is your factory located?
We have 2 production plant, one plant locates in Hangzhou which professionally producing EPS/EPP/ETPU machine. Another factory locates in Jiangsu Provide which producing EPS/EPP/ETPU mould. Both two factories are pretty close to the Shanghai port for easiest transportation.
2. Do you have detailed and professional installation manual?
We will provide very detailed installation manuals and videos, and the service until you are satisfied
3. Are you a trading company or a manufacturer?
We are manufacturer.
4. How long is your delivery time?
Normally delivery time is 30~45 days.
5. How many years have your company made this kind of equipment?
More than 10 years.
6. Can I only buy some spare parts from you?
Yes, we also provide all kinds of spare parts that relatives to our machine.
7. How do you pack the equipment?
We will strengthen and protect the equipment to ensure that they will not be damaged during transportation
8. Can you send your staff to install the equipment for us?
Under normal conditions, it is possible. Now it is an epidemic situation.
We will try our best to assist in case wecannot send technician in time. We will also conduct video connections with guests to teach them to install them in place.
9. Can you can design the equipment according to our size?
Yes, it is acceptable
10. How many production lines in your factory?
We have total 10 production line.