POLYSTYRENE FOAM BOX EPS MOULDING MACHINE
This series EPS molding machine long service life simple maintenance, equipment parameters will not be lost due to power failure and high reliability
Mechanical Structure :
a.high-strength square tube welded by tempering prevent form deformation .
b.after sand-blasting,greatly improve corrosion performance and service life of equipment .
c.after sand-blasting ,anti-rust spray zinc-rich primer,rust greatly improve the erformance and service life of equipment .
Electronic control:
a.adopt PLC(Mitsubishi) and HMI(WEINVIEW) ,for close-mold ,filling ,heating, cooling,de-mold,the whole proess is automatic.
b.all electronic components are used well-kown brands ,better stability of the equipment (Schneider).
c.the stroke is adjusted by the encoder controlled through the HMI settings ,easy adjustment and high accuracy .
Item | Unit | PSSM120B | PSSM140B | PSSM160B | PSSM170B | PSSM180B | PSSM200B |
Mould Dimension | mm | 1200X1000 | 1400X1200 | 1600X1400 | 1700X1500 | 1800X1600 | 2000X1800 |
Max Product Dimension | mm | 1050X850X350 | 1250X1050X350 | 1450X1350X350 | 1550X1350X350 | 1650X1450X350 | 1850X1650X350 |
Stroke | mm | 110-1360 | 170-1420 | 170-1420 | 170-1420 | 120-1370 | 40-1290 |
Steam Inlet | mm | DN80 | DN100 | DN100 | DN100 | DN100 | DN100 |
Steam Consumption | t/t | (10-15t)Steam of 1t Material | |||||
Cooling Water inlet | mm | DN80 | DN80 | DN80 | DN80 | DN80 | DN100 |
Cooling Water Consumption |
kg/cycle | 45-130 | 55-150 | 60-180 | 70-190 | 90-200 | 100-220 |
Compressed Air Consumption |
m³/cycle | 1.5 | 1.8 | 2 | 2.2 | 2.4 | 2.6 |
Vacuum Pump Capacity |
m³/h | 165 | 230 | 230 | 280 | 280 | 280 |
Drainage Port | mm | DN125 | DN150 | DN150 | DN150 | DN150 | DN150 |
Connected Load | kw | 11 | 13 | 17 | 17 | 17 | 20 |
Outside Dimension | mm | 4600X2100X3600 | 4600X2300X3800 | 4600X2500X4000 | 4600X2600X4100 | 4600X2700X4200 | 4600X2900X4400 |
Weight | kg | 4500 | 5000 | 6000 | 6500 | 7000 | 7500 |
Cycle Time | s | 60-100 | 60-120 | 70-160 | 80-170 | 80-180 | 90-180 |
FAQ
1. Where is your factory located?
We have 2 production plant, one plant locates in Hangzhou which professionally producing EPS/EPP/ETPU machine. Another factory locates in Jiangsu Provide which producing EPS/EPP/ETPU mould. Both two factories are pretty close to the Shanghai port for easiest transportation.
2. Do you have detailed and professional installation manual?
We will provide very detailed installation manuals and videos, and the service until you are satisfied
3. Are you a trading company or a manufacturer?
We are manufacturer.
4. How long is your delivery time?
Normally delivery time is 30~45 days.
5. How many years have your company made this kind of equipment?
More than 10 years.
6. Can I only buy some spare parts from you?
Yes, we also provide all kinds of spare parts that relatives to our machine.
7. How do you pack the equipment?
We will strengthen and protect the equipment to ensure that they will not be damaged during transportation
8. Can you send your staff to install the equipment for us?
Under normal conditions, it is possible. Now it is an epidemic situation.
We will try our best to assist in case wecannot send technician in time. We will also conduct video connections with guests to teach them to install them in place.
9. Can you can design the equipment according to our size?
Yes, it is acceptable
10. How many production lines in your factory?
We have total 10 production line.