EPS Foam Plastic Forming Machine Automatic EPS Foam Shape Moulding Machine
The main structure of the equipment is made of square steel welding, the electric control system is controlled by Mitsubishi PLC+ intermediate relay and AC contactors, and the steam system is controlled by high quality Angle seat valve made in China.
Main features:
1. The machine adopts PLC and HMI and advanced moulding technique and can produce various shape of EPS products;
2. The machine is fed filling, featuring high speed and full feeding.
3. The machine adopts digital coder to control mould opening and closing stroke, controlled by PLC and easy to adjust; Mould opening and closing is actuated by hydraulic system.
4. The vacuum system can accelerate moulding speed, reduce cooling time and decrease moisture content of the product.
5. Hydraulic systems adopts differential fast device, improve the speed of moving mould journey to a maximum ofabout 200mm per second, saving energy comsumption over 40%.
Item | Unit | PSSM120B | PSSM140B | PSSM160B | PSSM170B | PSSM180B |
Mould Dimension | mm | 1200X1000 | 1400X1200 | 1600X1400 | 1700X1500 | 1800X1600 |
Max Product Dimension | mm | 1050X850X350 | 1250X1050X350 | 1450X1350X350 | 1550X1350X350 | 1650X1450X350 |
Stroke | mm | 110-1360 | 170-1420 | 170-1420 | 170-1420 | 120-1370 |
Steam Inlet | mm | DN80 | DN100 | DN100 | DN100 | DN100 |
Steam Consumption | t/t | (10-15t)Steam of 1t Material | ||||
Cooling Water inlet | mm | DN80 | DN80 | DN80 | DN80 | DN80 |
Cooling Water Consumption |
kg/cycle | 45-130 | 55-150 | 60-180 | 70-190 | 90-200 |
Compressed Air Inlet | mm | DN40 | DN40 | DN40 | DN50 | DN50 |
Vacuum Pump Capacity |
m³/h | 165 | 230 | 230 | 280 | 280 |
Connected Load | kw | 11 | 13 | 17 | 17 | 17 |
Outside Dimension | mm | 4600X2100X3600 | 4600X2300X3800 | 4600X2500X4000 | 4600X2600X4100 | 4600X2700X4200 |
Weight | kg | 4500 | 5000 | 6000 | 6500 | 7000 |
Cycle Time | s | 60-100 | 60-120 | 70-160 | 80-170 | 80-180 |
FAQ
1. Where is your factory located?
We have 2 production plant, one plant locates in Hangzhou which professionally producing EPS/EPP/ETPU machine. Another factory locates in Jiangsu Provide which producing EPS/EPP/ETPU mould. Both two factories are pretty close to the Shanghai port for easiest transportation.
2. Do you have detailed and professional installation manual?
We will provide very detailed installation manuals and videos, and the service until you are satisfied
3. Are you a trading company or a manufacturer?
We are manufacturer.
4. How long is your delivery time?
Normally delivery time is 30~45 days.
5. How many years have your company made this kind of equipment?
More than 10 years.
6. Can I only buy some spare parts from you?
Yes, we also provide all kinds of spare parts that relatives to our machine.
7. How do you pack the equipment?
We will strengthen and protect the equipment to ensure that they will not be damaged during transportation
8. Can you send your staff to install the equipment for us?
Under normal conditions, it is possible. Now it is an epidemic situation.
We will try our best to assist in case wecannot send technician in time. We will also conduct video connections with guests to teach them to install them in place.
9. Can you can design the equipment according to our size?
Yes, it is acceptable
10. How many production lines in your factory?
We have total 10 production line.